Author name: Admin1

SA DU HAINAUT MARLY – en

HOUSING CONSTRUCTION OF 128 RENTAL DWELLINGS MARLY (57) REHABILITATION NEW REALIZATION IN OCCUPIED SITE BUILDING OWNER SA DU HAINAUT – GHI ARCHITECT Agence BOYELDIEU DEHAENE Agence MORRIS et RENAUD YEAR 2013 INVESTMENT Amount of the works: €10,600,000 duty free PROJECT Construction of 128 collective rental dwellings on rue d’Aulnoy in Marly distributed as follows: – […]

SA DU HAINAUT MARLY – en Read More »

ARTFX CAMPUS ROUBAIX – en

HOUSING ARTFX CAMPUS ROUBAIX (59) REHABILITATION NEW REALIZATION IN OCCUPIED SITE BUILDING OWNER ART DEVELOPPEMENT ROUBAIX-TOURCOING 95 Rue de la Galera 34000 MONTPELLIER DELEGATE BUILDING OWNER OPALIA 26 Rue du Prado 34170 CASTELNAU-LE-LEZ GROUP OF BUILDING OWNERS Architects : Valode et Pistre BET Fluides: Barbanel BET STRUCTURE:  SCYNA4 BET VRD: STRATE BET MUR RIDEAU: ESER

ARTFX CAMPUS ROUBAIX – en Read More »

PARIS – ORLY AIRPORT – en

INDUSTRY PARIS AIRPORT ORLY (94) REHABILITATION NEW REALIZATION IN OCCUPIED SITE BUILDING OWNER AÉROPORT DE PARIS – ORLY 94390 ORLY YEAR 2022 – 2027 INVESTMENT €19,000,000 duty free SURFACE 90,000 m² – 3,000 parking spaces PROJECT Rehabilitation and Electrification of the P2 car park Main works:  Normal / Security Lighting Electric vehicle charging stations Access

PARIS – ORLY AIRPORT – en Read More »

VERSALIS FRANCE – en

INDUSTRY VERSALIS FRANCE FORT MARDYCK (59) REHABILITATION NEW REALIZATION IN OCCUPIED SITE BUILDING OWNER Route des Dunes Mardyck 59279 DUNKERQUE T. 03.28.62.74.00 YEAR Studies: 2017 SURFACE / TYPE 7,5 km of perimetry PROJECT Feasibility study for securing the offices of the head office and the fences of the Dunkirk site. MISSION(S) Electricity Computer network CCTV

VERSALIS FRANCE – en Read More »

LFB 2020 PROJECT

INDUSTRY LFB 2020 PROJECT ARRAS (62) REHABILITATION NEW REALIZATION IN OCCUPIED SITE BUILDING OWNER REPRESENTATIVE ATEIM DUNKERQUE YEAR In progress MISSION(S)  TCE Project Management Assistance APS / PRO-DCE / ACT Lots MANING Thermic Electricity PROJECT Realization of the logistics and tertiary poles of the new generation production plant for plasma-derived medicinal products in Arras, including:

LFB 2020 PROJECT Read More »

Scroll to Top