LFB 2020 PROJECT

INDUSTRY

LFB 2020 PROJECT

ARRAS (62)

BUILDING OWNER
REPRESENTATIVE

ATEIM DUNKERQUE

YEAR

In progress

MISSION(S)
  •  TCE Project Management Assistance
  • APS / PRO-DCE / ACT
Lots MANING
  • Thermic
  • Electricity
PROJECT

Realization of the logistics and tertiary poles of the new generation production plant for plasma-derived medicinal products in Arras, including:

♦ Tertiary division:

Main guardhouse,
Administrative building,
Connection gallery to the logistics center,
Outdoor gallery linking the main guardhouse to the VL car parks and the administrative building.

♦ Logistics pole:


General locker rooms (unclassified),
Reception areas for raw materials, plasma materials and packaging items,
Storage areas,
Manufacturing order preparation area,
Shipping areas.

Scroll to Top