INDUSTRY
LFB 2020 PROJECT
ARRAS (62)
- REHABILITATION
- NEW
- REALIZATION IN OCCUPIED SITE
BUILDING OWNER
REPRESENTATIVE
ATEIM DUNKERQUE
YEAR
In progress
MISSION(S)
- TCE Project Management Assistance
- APS / PRO-DCE / ACT
Lots MANING
- Thermic
- Electricity
PROJECT
Realization of the logistics and tertiary poles of the new generation production plant for plasma-derived medicinal products in Arras, including:
♦ Tertiary division:
Main guardhouse,
Administrative building,
Connection gallery to the logistics center,
Outdoor gallery linking the main guardhouse to the VL car parks and the administrative building.
♦ Logistics pole:
General locker rooms (unclassified),
Reception areas for raw materials, plasma materials and packaging items,
Storage areas,
Manufacturing order preparation area,
Shipping areas.